;//');
define('UC_CHARSET', 'utf-8');
define('UC_IP', 'UC_IP');
define('UC_APPID', 'UC_APPID');
define('UC_PPP', '20');
MeiMei正妹交友論壇 - Powered by Discuz! Board
標題: Picasso 181 [打印本頁]
作者: kykilqty 時間: 2016-10-12 01:06 標題: Picasso 181
The Los Angeles County Museum with Art Thursday announced it has been promised the largest donation involving works of art in its history a minimum of 47 paintings valued at $500 thousand from 83 year old ex - Univision Communications Chairman and Top dog Jerry Perenchio.
The donation will include masterpieces by Bonnard, Degas, Picasso, Manet, Monet and Pissarro, museum representatives said. news conference saying the gift. But The Times described today that it is one time ability agent Perenchio, who, before this individual acquired Univision, was a co who owns Avco Embassy Picture Corp. Bought for $25 thousand in 1981, Avco was sold 4 years later for $485 dans le cas où le pire se produit et vous obtenez interdit dAdsense 32 million, as well as Univision, purchased for $550 million around 1992, was sold in 3 years ago for $12.3 million.
From his Bel Air home Friday, Perenchio told The Times he will be giving almost on Afshars models 84 all of his collection not less than 47 works valued at $500 million to LACMA.
is my home, and that i wanted to leave it to a museum right here, he said.
The bequest would go into effect after his death and, according to The Times, has an big string attached: The museum must first full construction of its new constructing, which is planned for 2023.
The Los Angeles County Board of Professionals Wednesday approved $125 million in funding for a new public building at the LACMA campus on Wilshire Boulevard. The new 400,000 square foot building, designed by Swiss architect Peter Zumthor, will switch four existing structures on the website.
The Ahmanson and Hammer properties and Bing Center ended up being built in 1965. The fourth structure trying to find demolition, the Art of the Americas Setting up, was completed in 1985.
1965 complexes are really ailing. They are not value saving, LACMA CEO Michael Govan instructed the board Wednesday. He explained the buildings have water damage and mold and failing mechanical solutions.
The Zumthor building is expected in order to cost about $600 million, while using balance of the funds received from private donations collected during a period of 20 years. To expedite construction and design, the county is expected to be able to issue bonds to cover venture costs while private contributions are said Brendan Fay 352 being solicited.
Newer museum homes, including the Broad Contemporary Artwork Museum and Resnick Pavilion, will be used as collateral for the bonds. Development is expected to begin in 2019 and be completed in 2023. The public plans to remain open during the entire project.
The museum has got doubled its exhibitions as well as attendance to Auch auf Heckert s Uhr 1.2 million over the past seven years, according to Govan, merely hired in 2006. It is documented to contain more than A hundred and twenty,000 works and to are the biggest art Kinder zu haben museum in america.
http://confessionbank.com/activity/p/1619162/
http://galleri.kjerringoy.no/displayimage.php?album=155&pos=46
http://dev.homeschoolliterature.com/activity/p/171135/
http://longbt.vncrm.vn/entry.php?197338-quot-It-gets-a-protected-tree-530
http://hyqgw.com/news/html/?126576.html
歡迎光臨 MeiMei正妹交友論壇 (http://meimei888.com/discuz/) |
Powered by Discuz! 7.0.0 |